|
Feature of the Month
SCHEDULING REPORTS in Retail Pro
FOR RETAIL PRO v8
USERS
(Windows Reports)
With the use of
the RPRO Scheduler, Retail Pro allows users to schedule
Report Groups
to run automatically. Follow the steps below to pre-schedule a report group
to print or save automatically.
-
From the main screen
of Retail Pro Windows Reports:
a. Click the REPORT GROUPS icon
b. Click the NEW button in the upper left
c. Name the report group and double-click on Reports from the
appropriate tabs to
be included in this report group
d. Select SAVE when finished

-
Once saved, take note
of the column in Report Groups labeled FILE NAME
The filename will usually be similar to 0000000#.RGP.


3. Now, the RPRO Scheduler must be started and modified. From RPRO
main screen:
a. Select TOOLS and then SCHEDULER
A new icon should appear in your system tray at the bottom right
of the screen,
by the windows time as shown below

-
a. Double-click on
the RPRO Scheduler to open the window shown below
b. Select EDIT and ADD TASK from the top

-
a. In the top of the
window that appears, give the task a name
Name the task reflective of what you’re scheduling
(Weekly Reports, Monthly Reports, etc.).
b. Select the RUN PROGRAM radio button from the left side

-
a. In the box to the
right, labeled Program Name, type or use the folder browse button
to find the REPORTS.exe program.
b. In the box labeled Start In, click the browse folder to the
right
c. Select OK. A typical BHD workstation will look as below.

-
a. In Parameters,
find the action that describes your desired action.
b. Type the filename to the left of the desired action.
NOTE: In place of 0000000#.rgp, type appropriate filename
noted in Step 2.
|
Parameter |
Action |
|
/pgp
0000000#.rgp |
Print the
report group to the default printer |
|
/pgs
0000000#.rgp |
Save the
report group for Review |
|
/pgs:excel
0000000#.rgp |
Save to an MS
Excel file |
|
/pgs:exceltxt
0000000#.rgp |
Save to a
text file ready for MS Excel |
|
/pgs:txt
0000000#.rgp |
Save to a
text file |
|
/pgs:html
0000000#.rgp |
Save to an
HTML file |
|
/pgs:pdf
0000000#.rgp |
Save to a PDF
file |
-
a. Select the
SCHEDULE tab in the upper left of the screen.
b. Select the appropriate date & time you want to schedule this report
group to run.
In this example, we want a report to run weekly at 6am.

-
a. Select OK
to close this scheduled task
b. Select FILE and SAVE to save this scheduled task
c. Optionally, you may choose to select OPTIONS and then RUN
ON STARTUP as
well as MAKE CURRENT SCHEDULE DEFAULT.
SCHEDULING REPORTS in Retail Pro
FOR RETAIL PRO v7 USERS:
With the use of the RPRO
Scheduler, Retail Pro allows users to schedule
Report Groups
to run automatically. Follow the steps below to pre-schedule a report group
to print or save automatically.
-
From the main screen
of Retail Pro Windows Reports:
a. Click the REPORT GROUPS icon
b. Click the NEW button in the upper left
c. Name the report group and double-click on Reports from the
appropriate tabs to
be included in this report group
d. Select SAVE when finished

-
Once saved, take
note of the column in Report Groups labeled FILE NAME.
The filename will usually be similar to 0000000#.RGP.
 
3.
Now, the RPRO Scheduler must be started and modified. From RPRO main
screen:
a. Select TOOLS and then SCHEDULER
A new icon should appear in your system tray at the bottom right
of the screen,
by the windows time as shown below

 
4. a. Double-click on the RPRO Scheduler to open the
window shown below
b. Select EDIT and ADD TASK from the top

5.
a. In the top of the window that appears, give the task a name
Name the task reflective of what you’re scheduling
(Weekly Reports, Monthly Reports, etc.).
b. Select the RUN PROGRAM radio button from the left side

-
a. In the box to
the right, labeled Program Name, type or use the folder browse
button to find the REPORTS.exe program.
b. In the box labeled Start In, click the browse folder to the
right
c. Select OK. A typical BHD workstation will look as below.

-
a. In Parameters,
find the action that describes your desired action.
b. Type the filename to the left of the desired action.
NOTE: In place of 0000000#.rgp, type appropriate filename
noted in Step 2.
|
Parameter |
Action |
|
/pgp
0000000#.rgp |
Print the
report group to the default printer |
|
/pgs
0000000#.rgp |
Save the
report group for Review |
|
/pgs:excel
0000000#.rgp |
Save to an MS
Excel file |
|
/pgs:exceltxt
0000000#.rgp |
Save to a
text file ready for MS Excel |
|
/pgs:txt
0000000#.rgp |
Save to a
text file |
|
/pgs:html
0000000#.rgp |
Save to an
HTML file |
|
/pgs:pdf
0000000#.rgp |
Save to a PDF
file |
-
a. Select the
SCHEDULE tab in the upper left of the screen.
b. Select the appropriate date & time you want to schedule this report
group to run.
In this example, we want a report to run weekly at 6am.

-
a. Select OK
to close this scheduled task
b. Select FILE and SAVE to save this scheduled task
c. Optionally, you may choose to select OPTIONS and then RUN
ON STARTUP as
well as MAKE CURRENT SCHEDULE DEFAULT.
|